Moment 04 · Sale, Refinance & M&A

Diligence against verified operating history — not a data room.

The complete structured record travels with the asset: every covenant event, every resolution, every month of reconciled performance. Exportable in minutes.

"Operational diligence in 90 minutes, not 90 days." Buy-Side · Sell-Side · Secondaries · Refi
What You Get
FOR THE BUYER
Diligence-Ready Asset Profile

Complete structured history of every covenant event, modification, and variance. Underwrite the operating truth.

FOR THE SELLER
Clean Compliance Demonstration

Show every buyer the compliance history with one click. No consultant assembly, no IE refresh.

FOR REFI LENDERS
Underwrite The Existing Record

The operating record flows directly into refinance underwriting. History becomes empirical evidence.

FOR SECONDARIES
Portfolio-Level Diligence

Evaluate a multi-project portfolio through one platform. Same structured record for every asset.

Operational diligence: 60–90 days → same week. Consultant & IE fees: $150K–$500K → mostly avoided.

See It In Action

The Transaction-Ready Asset Profile. Every document parsed, every event resolved, 38 months of reconciled performance. Try the export.

app.lcoe.ai/diligence/cedar-grove-community-solar
Illustrative Data
Cedar Grove Community Solar — Diligence Profile12.5 MW · COD Mar 2023 · Augusta, GA · single-axis ground mount
Record Months
38
Lifetime vs P50
−2.6%
Open Issues
0
Documents
247
Record Inventory
Record Completeness98%
Missing: original geotech report (flagged to seller)
Credit Agreement — parsed41 covenants tracked
PPA — Georgia Power offtake20-yr · parsed
EPC & warranty stackparsed · claims linked
O&M agreement + service log38 mo continuous
REC agreement & registryparsed · tracked
Performance data — reconciled38 mo · weather-adj
Covenant event history3 events · all resolved
Structured Asset History
Mar 2023
Commercial Operation

COD certified. Monitoring connected day 1 — record begins with zero gap.

Nov 2023
Weather Variance Event

Generation −9% vs P50 (irradiance −11%). Weather-adjusted: within model. No covenant impact.

Apr 2024
DSCR Cure Event — Resolved

DSCR touched 1.24x vs 1.25x floor. Asset owner cured in 22 days. Full cure documentation attached.

Jun 2025
O&M Provider Transition

Service continuity verified — no availability gap. Both contracts parsed and diffed.

Feb 2026
Refinance Inquiry

Full diligence package exported to a prospective lender in 90 minutes.

38 Months — Generation vs Underwritten Model (weather-adjusted)
Diligence package compiled. 247 documents · 38 months reconciled · full covenant event history with resolutions. Ready to share.

What a buy-side team rebuilds over 60–90 days already exists — structured, verified, exportable.

Request a Walkthrough  →
Back to the start · Moment 01

The buyer's underwriter inherits the record on day 1.

Enter the Underwriter view →